  • PEC Application notes

    Even the strongest component may face trouble if not applied properly. Our brochure helps to evaluate, calculate, and select capacitors properly. All you need to know, compiled in one book.

    Publication No.: 200.003-020021
    Edition: 05/2024
    Language: English/German

    Changelog

    2024/05 - New edition of the catalogue
    2022/04 - New edition of the catalogue

  • ZVEI PFC and Climate Protection

    Power Factor Correction is a basic, but significant contribution to saving energy resources and reducing power losses. This ZVEI paper sums up all the arguments in favour.
  • ZVEI Guideline Partial Discharge Measurements

    PD measurements on capacitors are intended to detect potential defects in the insulation in order to prevent future failures, as partial discharges may weaken the insulation to the housing and within the dielectric.
    The procedures for PD measurements are described in various IEC standards. However, especially with regard to the testing of capacitors, there may be limitations and misinterpretations regarding the informative value of such tests. This common guideline by the capacitor manufacturers organized in the ZVEI intends to prevent such misunderstandings.

  • ZVEI Merkblatt Netzanschlussbedingungen

    Statement of the ZVEI-Power Capacitors Division on VDE-AR-N 4110: Technical rules for the connection of customer systems and their operation. Harmonics at the MV network connection (available in German language only)

  • ZVEI Safety Recommendations

    Power capacitors are electrical energy storage devices which must always be handled with caution. In error situations they can cause serious injuries or damage to persons and adjacent equipment. This document was developed jointly by Germany’s capacitor manufacturers to promote understanding of the risks and how to deal with them.

Connection and Mounting Instructions

  • E50-E55, E60, E61, E66

    Notes on the installation, connection, disposal and safety of unprotected cylindrical capacitors with resin or gas filling. This note is enclosed with our delivery units.

  • E62, E63, E65

    Notes on the installation, connection, disposal and safety of unprotected cylindrical capacitors with resin or gas filling. This note is enclosed with our delivery units.

  • 275_280

    Notes on the installation, connection, disposal and safety of unprotected cylindrical capacitors with resin or gas filling. This note is enclosed with our delivery units.

  • E56-E92